Archive

ACT Coamo Landslide   After Hurricane Maria, Puerto Rico’s infrastructure suffered major damages. Design Build helped in the construction of various projects around the island. This particular project consisted on the construction of embankment, pavementation, cold milling of bituminous concrete pavement, construction of curbs and gutters, sidewalks,...

Los Peña Head Start Reconstruction   The " Los Peñas" Head Start Reconstruction project in the Municipality of San Juan consisted of the removal of existing office wagons and the construction of a concrete two-level building. It included an electrical substation, a playground, kitchen, elevator, lounges on...

Camp Santiago Readiness Center   Construction and rehabilitation of a facility around 9,257 sqft including: Administrative Office Areas, Unit, Storage Area with Weapons/Ammunition Vault, Training Device/Simulation Center, Maintenance Training Work bay, Locker Room Areas, Break Room Area, Toilets / Showers, Flammable Materials Storage, Mechanical, electrical and Telecommunication...

Rooftop Rehabilitation of Concilio Integral de la Salud, Loiza   52,000 square foot Roof Waterproofing of the Centro de Salud Integral de Loiza Inc Building.   Ready to get to work? [button size='' style='' text='CONTACT US' icon='' icon_color='' link='/contact' target='_self' color='' hover_color='' border_color='' hover_border_color='' background_color='' hover_background_color='' font_style='' font_weight='' text_align='' margin='']...

Patillas Urban Water Filtration Plant   This project involved upgrading the 6 MGD Patillas Urban Filtration Plant including furnishing and installation. Construction Drawings and specifications prepared by the PRASA. This project improved the water supply service to the municipalities of Patillas, Guayama, Arroyo and Salinas.    Ready to get...

Fort Buchanan Access Control Point   Construction of Access Control Point (ACP) to meet Department of the Army (DA) Standards at the Main Gate at Fort Buchanan, Puerto Rico. We worked on the construction of the Visitor Control Center (VCC), Gatehouse, Guard Booths at the ID Check...

Ramey Reserve Center: Roof Repair   Design & build Project - Remodeling of two buildings and site facilities, construction of new three-story connector structure, new substation, new arms vault, sanitary sewer system, asbestos and lead abatement, fire suppression system, LED site lighting, finishes and ATFP compliance.   Ready to...

Sanitary Sewer System for Lago La Plata Community   Design and construction of a new conventional sanitary sewer system for Lago La Plata Community in the Guadiana Ward of Naranjito. The project included: design-build supporting studies, design, furnishing and installation of sanitary sewer gravity and force pipelines,...